Home/Services/Industrial Electrical Reliability

Prevent Failures Before They Stop Production.

Premier Electrical & Engineering provides industrial electrical reliability and predictive maintenance services designed to identify developing electrical problems before they result in costly downtime, equipment damage, or production interruptions.

The Problem

Most plants find out about an electrical problem when a line stops. The breaker that finally opened had been running warm for eight months. The drive that failed had been fed a 3.1 percent voltage imbalance since the last expansion. The transformer that let go had been running at 118 percent of nameplate through two summers.

None of that is invisible. All of it is measurable while the plant is still running. What is usually missing is not capability or budget — it is that nobody owns the electrical system as a whole. Maintenance owns the machines. The contractor owns the last job they were called for. The one-line on the wall is from 2009.

The result is a system that is maintained reactively, in pieces, by whoever is on site the day it breaks.

What Premier Does

We take ownership of the electrical system as an engineered asset. That means knowing what is installed, measuring how it is behaving, interpreting what that means, and telling you what to do about it in an order that reflects real consequence.

  • Understand the infrastructure — what is installed, how it is fed, and how it is actually loaded.
  • Identify developing failures — through thermography, power-quality monitoring and condition inspection.
  • Analyze system performance — loading, imbalance, harmonics, protection and capacity.
  • Establish a maintenance program — intervals and scope matched to criticality.
  • Document equipment condition — with images, measurements and a rating that means something.
  • Prioritize corrective action — ranked by consequence, not by whoever complained loudest.
  • Coordinate the repair — scoped and handed to appropriately licensed electrical contractors.
  • Verify the fix — re-inspected under load before the finding is closed.
  • Track it over time — so this year’s data has something to be compared against.

Assess → Monitor → Analyze → Prioritize → Correct → Verify → Track

Assess

Establish the baseline. What is installed, how it is fed, where it sits, and what it costs you when it stops.

Monitor

Inspect and test critical assets on an interval driven by criticality, load and environment — not by the calendar alone.

Analyze

Interpret thermal and electrical data in the context of load at the time of measurement, equipment history and recognised criteria.

Prioritize

Sort findings into what stops the plant, what damages equipment, and what can wait for the next outage window.

Correct

Turn each finding into a scoped work item and coordinate it with appropriately licensed electrical contractors.

Verify

Re-inspect under comparable load after the work. Findings close on evidence, not on a work order status.

Track

Maintain the equipment record over years, so degradation shows as a trend rather than as a surprise.

Why recurring

A single infrared survey tells you what is hot today. It cannot tell you what is getting hotter. The value of a reliability program is in the second and third pass, when a connection that read 12 °C over ambient last year reads 34 °C this year at the same load — that delta is the finding, and you only have it if somebody kept the first record.

Where Corrective Work Fits

Premier’s role in a reliability program is engineering, inspection, diagnostic testing, analysis and documentation. When a finding needs physical work — a connection retorqued, a breaker replaced, a feeder reterminated — Premier can coordinate recommended corrective work with appropriately licensed electrical contractors, whether that is your existing contractor or one we help you source.

That separation is deliberate, and it works in your favour. The party identifying the problem has no financial interest in the size of the repair. When we tell you a finding is a priority, that is an engineering judgement, not a quote.

Build a Reliability Program for Your Facility.

Tell us about the plant — size, voltage levels, the equipment that matters and what has been giving you trouble. We will come back with what a first assessment would cover and what an ongoing program would look like.